Make the key decisions on the plan
Mark the toilet, basin, shower, kitchen sink, water heater and appliances before running pipes. Check unit dimensions, door and drawer clearances, and future appliances such as a dishwasher or filter. Record each location against a permanent wall or corner. This makes the plan more useful than a verbal description such as “put the outlet in the middle.”
Seven steps to review with your installer
1. Confirm the fixture positions and clearances. 2. Review hot and cold supply separately from drainage. 3. Agree on compatible pipes and fittings suitable for each run. 4. Keep isolation valves, traps and inspection points accessible. 5. Check the kitchen and bathroom layouts separately. 6. Have the relevant lines and fixture connections tested before finishes conceal them. 7. Photograph the routes and keep reference measurements for future work.
| Planning item | What to prepare |
|---|---|
| Fixture positions | A measured layout and fixture dimensions |
| Supply and drain routes | Separate routes, valve access and compatibility |
| Before closing walls | Test results, updated plans and photos |
Plan each room around its actual use
In the bathroom, coordinate the shower, WC, basin, floor drain and waterproofing, while keeping access for servicing. In the kitchen, start with the cabinet layout and sink unit, then add the tap, filter and dishwasher or washing machine if needed. Leave room to reach the trap, hoses and valves without dismantling the cabinet.

Concealed versus accessible routes
A concealed run inside the wall or floor may require local opening for future repairs. A route below a slab or behind a suitable service enclosure can be easier to reach if access is planned. Review the building design, floor levels, ceiling clearances and waterproofing with your installer before choosing a route.
Handover before closing up
Ask the installer to walk you through the fixtures, valves, drainage tests and any changes to the approved layout. Keep marked-up plans and photographs. Resolve any conflicts with electrical or ventilation work before the finishes go in. If you are requesting a quotation, send the room plan, photos and the fixture or appliance list.
Frequently asked questions
When should fixture locations be fixed?
Confirm them before pipe routes are laid out, using actual or planned fixture dimensions.
Why review water supply and drainage separately?
They serve different functions and have different routing, connection and access requirements.
How do I prepare for appliances that will be added later?
Include each planned appliance and its connection needs in the layout before cabinets and surfaces are installed.
What should be tested before finishing?
Ask the installer to check the supply connections and test drainage at the relevant outlets before covering the runs.
What should I keep after handover?
Keep photos, measurements and the updated layout showing valves, access points and concealed runs.